PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding beam clips for the stone panels at the North Elevation (800x600).jpg Continued installing duct work at the 1st Floor Facing North (800x600).jpg Installed metal decking at Stair -4 Roof Facing North (800x600).jpg Sanitary Piping at the 1st Floor Facing East (800x600).jpg Started installing the sanitary piping at the 1st Floor Facing East (800x600).jpg Started laying out block at the Juvenille-Adult Cells Facing South-East (800x600).jpg